Construction Progress Update

gen4The shipping container from Germany arrived with the dry feeder, custom made double membrane roof, mixers and various other supplies.   The pasteurizer/controls container from Germany arrived Friday and was set into place.

The genset room is starting to take shape.  The Sonotubes have been filled with concrete and re-bar cage.  The gensets will each sit on 4 Sonotubes that are 36″ in the ground.  This will ensure that the vibration of the genset is isolated and brought down into the ground instead of vibrating the whole floor.  The sound block wall has been installed and is looking good.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Green Living Tips

Turn off your lights
Turn off your lights when you are not using them. The benefits are obvious.
Add this to your site

Green Living Tips

Do not get a paper phone book
Instead of getting a paper phone book. Use a online directory instead.
Add this to your site
Greenscroll certified