Construction Progress Update
The shipping container from Germany arrived with the dry feeder, custom made double membrane roof, mixers and various other supplies. The pasteurizer/controls container from Germany arrived Friday and was set into place.
The genset room is starting to take shape. The Sonotubes have been filled with concrete and re-bar cage. The gensets will each sit on 4 Sonotubes that are 36″ in the ground. This will ensure that the vibration of the genset is isolated and brought down into the ground instead of vibrating the whole floor. The sound block wall has been installed and is looking good.